+ 44 (0) 1304 853938

Plant Attachment Rental And Sales

Mutley News

 

  
Case CX 800 Mutleys Plant Service Ltd has recently designed and built a 25 meter long reach excavator on a Case CX 800 chassis, which is now in service on the prestigious Thames Gateway project in Shellhaven, Essex.


The project is a joint venture between two major dredging and land reclamation companies, and has raised the artificial island from the bed of the river Thames, by sand dredging and rock placement.

The Island will eventually become home to a new container terminal. 

 

 

 

 

Mutley Plant Service Ltd has completed our fifth hydraulic cab raiser this year, three of which are to go to a large public authority in Bradford

 

 

 

 

 

 

From tha large to the small, Mutley Plant has just completed

a Hitachi EX 30 and concrete cracker for Micor Demolition

for a project to start in Febuary. 

 

 Mammoet Slavage working in North Africa, with two Verachtert VHS 70 Shears,

 Mounted on Hitachi ZX 870

 

 

Mutley Plant Service Ltd add the Mighty Verachtert VT 60 to their rental range, the Giant Multi-Processor is available with a range of four different jaw sets to fit 60 tonne excavators and up, please download Technical spec sheet from ‘ Services’ “Technical Downloads”

 

Mutley Plant Service Ltd, build Volvo EC 88 to 8 meters for supermarket Demolition Project

ART EC 88

 

Mutley Plant Service has invested into the latest computer controlled, Plasma and gas profile burner,

 to further increase the efficient production on excavator and attachment parts.

 

Tech Serve Profiler